top of page
All Posts


Sewage Treatment Plant Installation in Sellindge, KentMarsh Nitro Lite & Phos Lite System Installed by R Harvey Drainage
At R Harvey Drainage, we recently completed another successful sewage treatment plant installation in Sellindge, Kent, delivering a high-quality solution designed for long-term reliability and environmental compliance. This project involved the installation of a Marsh Nitro Lite 20 population (20PE) combined with a Marsh Phos Lite 20PE system, tailored specifically to meet the needs of the property. Why This System Was Chosen The combination of the Nitro Lite and Phos Lite sy
Tracey Harvey
Apr 292 min read


Fast and Reliable Toilet and Sink Clearances Ashford Kent
Blocked sinks and toilets can be frustrating and disruptive, but our experienced team can get things flowing again quickly with minimal mess. Common Issues We Resolve We regularly attend jobs involving: ✔ Blocked kitchen sinks (often caused by grease and food build-up) ✔ Bathroom sink blockages (hair and soap residue) ✔ Blocked toilets and slow flushing ✔ Recurring drainage issues Fast, Effective Solutions Using the right tools and experience, we can clear blockages quickly a
Tracey Harvey
Apr 291 min read


Checking the Flow with Dye Testing
We recently carried out a drain dye test to check whether the system was flowing correctly. What is Dye Testing? Dye testing involves adding a coloured, non-toxic dye into the drainage system to track the flow of water. This helps us to: ✔ Confirm if water is flowing freely ✔ Identify blockages or slow drainage ✔ Check connections between pipework ✔ Pinpoint where issues may be occurring Why Use Dye Testing? In some cases, dye testing is the quickest way to troubleshoot drain
Tracey Harvey
Apr 271 min read


ACCO Drain Exposure & Clearance in Ashford, Kent
The ACCO drain had become covered and blocked , preventing water from draining away effectively. This can often lead to surface water build-up, pooling, and potential flooding if not addressed. Our Solution Our team carefully exposed the ACCO drain and carried out a full clearance, removing all debris and blockages to restore flow. The work included: ✔ Exposing the drainage channel ✔ Removing built-up debris and blockages ✔ Ensuring full water flow was restored ✔ Leaving the
Tracey Harvey
Apr 231 min read
bottom of page
